Chesapeake Bay TMDL

Print
Press Enter to show all options, press Tab go to next option

For more information about this project, please visit www.leesburgva.gov/tmdl.

Foxridge-Pond-Complete

Project Description:  The Town is required to implement a Chesapeake Bay TMDL (Total Maximum Daily Load) Action Plan to meet the nitrogen, phosphorus, and sediment reduction requirements put in place by the Department of Conservation and Recreation. 

This project included retrofitting the Greenway Farm, Foxridge and Stratford stormwater management ponds to provide additional pollutant removal. These retrofits included adding forebays, constructed wetlands, micro-pools, and/or extended detention facilities to the ponds.

Project Status:  The project was completed in July 2018. 

Staff Contact: Anne Geiger 703-771-2742 

Design Engineer: Wood Environment & Infrastructure Solutions, Inc. (formerly Amec Foster Wheeler Earth & Environmental)

Construction Contractor: Synchronized Construction Services, Inc.

 


Chesapeake Bay TMDL Project Locations

 

Ribbon-Cutting