Water Treatment Plant Sedimentation Basin Sludge Collection Equipment and Building Refurbishment
Project No. 30501
Project Start Date: Fall 2029
Estimated Completion Date: Spring 2031
Project Manager: Joe Phillips 703-771-2728
Project Description: This project provides for the replacement of the water filtration plant sedimentation basin equipment, including refurbishment of the sludge collection system and the replacement of the structures that protect these assets. The sludge collectors were originally installed in the 1990's and the protective covers that prevent freezing were installed in the early 2000's.