Browns Meadow/Woodberry Drainage Improvements

Print
Press Enter to show all options, press Tab go to next option

Browns Meadow AerialProject Description:  This project included the extension and upgrade of the storm drainage system serving the area.  The purpose of the improvements was to reduce overland flow of runoff coming from both Town-maintained storm sewer systems and from private properties that cross adjacent private properties, and to eliminate ponding on and adjacent to an existing Town storm drainage easement.

Project Contracts:

  • Design Engineer: Paciulli Simmons & Associates
  • Construction Contractor:  Utilities Unlimited, LLC

Project Status: This project was completed in 2016.