Skip to page body Home About Community Living Doing Business Browse by Topic I Want to... Your Government

WATER

As part of the plan approval process, design engineers must submit a water model demonstrating that adequate domestic and fire flows will be available to their proposed on-site water pipe network, as per the requirements of the Leesburg Design and Construction Standards Manual (DCSM). The Utility Department can provide flow, pressure, and hydraulic grade line information for connection points to the Town's water pipe network.

SANITARY SEWER

As part of the plan approval process, the adequacy of the existing sanitary sewer system receiving flows from a proposed project must be determined, as per the requirements of the Leesburg Design and Construction Standards Manual (DCSM). The Utility Department provides available capacity information for connection points to the Town's sanitary sewer network.

PROCEDURE FOR REQUESTING SYSTEM MODELING

To request system modeling, the applicant must send a written request with a map indicating the point of connection(s) to the Town's water and sanitary sewer system. A fee check of $500 ($250 per model) made payable to the Town of Leesburg must accompany the modeling request. If additional information is needed, please contact us at 703-771-2750.

See Water or Sanitary Sewer System Modeling Charges for a breakdown of fees and charges.

Last updated: 6/30/2014 3:21:12 PM