Project
|
Type
|
Project Summary
|
|
Ida Lee Park Tennis Court – Seasonal Air Structure
|
Parks & Recreation
|
Seasonal air structure with storage building and entrance structures over an existing three court pod, including beam for anchoring the air structure around the court perimeter, new exterior lighting and fencing.
|
|
Olde Izaak Walton Pond
|
Parks & Recreation
|
Improve the condition of the pond at the park. Pending further council discussion of long-term disposition of the property.
|
|
Tuscarora Creek Trail Phase I (was South King Street Trail Extension)
|
Parks & Recreation
|
Trail from W&OD Trail at Douglass Community Center via the Tuscarora Creek stream valley to Brandon Park at Harrison Street. This 1,500 foot trail will provide access to the Crescent District, Catoctin Skate Park, Douglass Community Center, and W&OD Trail.
|
|
Tuscarora Creek Trail Phase II
|
Parks & Recreation
|
Trail from Brandon Park at Harrison Street to Davis Avenue and Olde Izaak Walton Park via the Tuscarora Creek stream valley. This 2,500 linear foot trail provides access to Olde Izaak Walton Park, and includes a crossing of Tuscarora Creek.
Once completed, the project will provide access from Olde Izaak Walton Park near South King Street to the W&OD Trail at Douglass Community Center.
|
| 1st Street Extension |
Streets, Building & Grounds |
Extend 1st Street from the car wash to Davis Avenue |
| 1st, 2nd & Wirt Street, SW |
Streets, Building & Grounds |
Design and construction of storm drainage improvements including concrete curb and gutter to alleviate flooding of yards and drainage problems along 1st Street west of South King Street, 2nd Street and Wirt Street, SW. Project improvements to be sensitive to existing neighborhood character. |
|
Advanced Transportation Management System, Phase II
|
Streets, Building & Grounds
|
Electronic connection of existing traffic signals along Edwards Ferry and Fort Evans Road to allow monitoring of the system from a control center in Town Hall to improve congestion and air quality by enhancing traffic flow.
|
|
Battlefield at Route 7 Interchange
|
Streets, Building & Grounds
|
Construct a grade separated interchange at this location. This part of Route 7 is maintained by VDOT. Project should be funded by VDOT.
|
|
Edwards Ferry Road Sidewalk – North Side
|
Streets, Building & Grounds
|
Install sidewalk along the north side of Edwards Ferry Road from Shenandoah Building to Heritage Way.
|
|
Harrison Street Extension
|
Streets, Building & Grounds
|
Extend Harrison Street from North Street to Oakcrest Manor Drive.
|
|
Lawson Road Bicycle/Pedestrian Crossing of Tuscarora Creek
|
Streets, Building & Grounds
|
Design and construction of a new stream crossing to provide bicycle and pedestrian access to the W&OD Trail from residential communities.
|
|
North King Street at North Street Traffic Signal
|
Streets, Building & Grounds
|
Loudoun County has proffered a signal at that location. This signal will be needed when the courthouse expansion project is completed.
|
|
South King Street at Davis Avenue Sidewalk
|
Streets, Building & Grounds
|
Install sidewalk on both sides of Davis Avenue from South King Street to the Valley View Drive intersection.
|
|
West Market Street/Morven Park Road/Loudoun Street Intersection Improvements
|
Streets, Building & Grounds
|
Design and construction of intersection improvements to improve vehicular and pedestrian safety and traffic congestion. Study completed in March 2009 on potential design options.
|
|
Royal Street East Storm Drainage Improvements
|
Storm Drainage
|
Install curb and gutter on East Royal Street between Harrison Street at Market Station and the Tollhouse Plaza shopping center. Recommendation of study is that this becomes a maintenance project.
|
|
South Street at South King Street
|
Storm Drainage
|
Storm drainage improvements to alleviate flooding of a single family home at the corner of South Street and South King Street. Project dependent upon future Waterford development.
|
|
Town Branch at Mosby Drive
|
Storm Drainage
|
Purpose of the project is to stabilize the eroding channel and reduce potential flooding.
|
|
Woodberry Road Drainage Phase II
|
Storm Drainage
|
Alleviate flooding of yards in the lower portion of the block bounded by Woodberry Drive, North Street, and Wildman Road. If approved in future, Town should consider constructing project as a maintenance effort by Department of Public Works.
|
|
Parcel Consolidation
|
Airport
|
Consolidate approximately 17 individual parcels. Project is supported by FAA and Town Master Plan. Significant funding to be provided by FAA and DOAV.
|
|
Runway 17 Extension
|
Airport
|
Extend the runway for approximately 500 feet to accommodate larger aircraft. Project is part of FAA and Town Master Plan for the airport. Significant funding to be provided by FAA and DOAV.
|
|
Town wide service area water system improvements
|
Utilities
|
New waterlines to insure water availability to the Town-wide service area. Projects will be defined based on an engineering study.
|
|
Utility Lines Storage Building
|
Utilities
|
Construction of a 40’x80’ metal building for storage of equipment and materials currently stored at the public works facility, freeing up space needed by Public Works.
|